Main stages of repair in the apartment

Main phases of repair in the apartment.

How to start repair of the apartment?

The first phase of the repair work of old apartment or condos is the damage and taking apart to start with of the shabby walls and partition walls, removing the wall and ceiling coating. This phase is among the most "unclean" stages of the repair.

One more among the most essential and "dirty" works is the window block replacement. It is necessary to do this firstly due to the fact that dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is needed to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).

The following stage is circuitry. Wiring can be set up in walls or along the flooring. Electrical wiring is made inside the pipelines to make sure electrical security and increase reliability. The pipeline secures electrical wiring from external damages and enables to replace the wire completely without breaking walls and floor simply by placing the new wire rather of the old one.

House Painting follows the wiring. The regular error during the synchronised conducting of such works happens when workers forget to set out among the cable televisions and house painters have actually currently plastered and smoothed out the wall. As a result, additional works are needed to seal goes after on the ended up wall. The locations of the feed switch and wall outlet location and their number should be thought-out ahead of time. The plan of power electrical wiring is normally included into the design project.

Later on the system must be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable are laid out. The power cable ought to not be laid out near the telephone and antenna cables to avoid sound pickup and disturbance. The most peculiar minute is setting out the TV cable. In order to make 2 (or 3) TV sets in the house the second cable is often just "firmly soldered" in parallel, so the cable television resistance is decreased. As an outcome, the display screen quality is degraded, many programs can't be received and etc. In order to prevent such scenario it is required to welcome a professional with unique equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is conducted concurrently in all facilities, if it is possible. Hold-ups are linked with the technology. Each applied layer of the plaster (or completing completing) need to dry entirely before the work will continue.

Works in hygienic arrangements and the kitchen start all at once with house painting. It is better to satisfy so-called "unclean" operate in the top place and simultaneously. In accordance with the plan of the sanitary professional area welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then operates in sanitary arrangements are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following stage is putting together ceiling and laying tiles on the floor. And at last other hygienic devices, mixers and accessories are mounted.

After electrical wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this phase in order to save their surface area appearance. The surface puttying of walls is carried out at the same time. The highly specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines moisture of the material.

The following stage is the process of fill. Fill can be made with various products-- from normal masonry cement-sand mixture to self-aligning floors. The advantage of the simple mixture is its cheapness, the downside is that such mixture is much more difficult aligned at the level and the last dry time of such fill is 40 days, only then the next stage of the deal with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are far more expensive, however more technological. Aligning happens nearly "automatically" i.e. fluid option of mix is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry aligning (the fill technology) is used bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account density of future flooring covering. After setup the door can be taken off its hinges and removed till the end of repair or loaded into polyethylene film to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile needs to be laid on the definitely dry overlay.

Finishing of the floor mounting depends upon the prepared covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close fixing of plywood and long-term service of the floor without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where finish covering of the flooring is laminated flooring or parquet stockpile, the common wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.

If finish covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned consequence is linked only with such scrambling procedure when the fantastic amount of dust is produced. In spite of the truth that excellent floor mills are geared up with the vacuum cleaner, the sufficient amount of dust is sped up on surrounding topics including walls. Dust is very acerbic and is badly cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be ended up. It is left only to trusted plumber near me set up the plinths, decorative aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is needed to keep in mind that the sequence of works was noted in basic and can change depending on the guaranteed circumstance-- the variety of rooms in premise, your resources, peculiarities of the construction of the multilevel properties. It is based upon common sense and everyone capable of analysis can separately produce such a series.